Asab Full Field Development

By accadmin,

ADCO Full Field Development involved increasing production from all three SAS Fields, Sahil, Asab and Shah, and providing facilities to cater for their operation until 2040.

In particular, ASAB Field Development Project objective included:

– Upgrading production from 280 MBOPD to 345 MBOPD.

– Accept production from Sahil, Shah, and other fields of 255 MBOPD.

– Export peak of 720 MBOPD of stock tank crude oil from ASAB CDS.

– Install produced water handling facilities to cater for a peak of 300 MBWPD (Phase I).

 

Major Scope and Quantities Include:

  • 150,000 ID of Piping
  • 30 Hot Taps and 250 other Tie-Ins
  • 4,000 Tons of Steel Structure
  • 1,000 Tons of Static & Rotating Equipment erection

  Category:
  Comments: Comments Off on Asab Full Field Development

Onshore Gas Development Phase III Project – OGD III

By accadmin,

The OGD-3 involves the construction of a new gas plant in the Habshan area (Bab field) to process some 1310 million cubic feet per day (CFPD) of well stream fluid into 11,000 tones per day (TPD) of NGL, 3400 TPD of ethane and 125,000 bpd of condensate.

Major Scope and Quantities Include:

  • 750,000 Inch Dia of Piping
  • 790 T of Pipe Supports
  • 5,000 Tests packs
  • 27,000 Tons of Static & Machinery Equipment including but not limited to:
    • Fired Heaters
    • Pumps, Motors, Finfan Coolers, and Heat Exchangers
    • HP, MP, and LP Gas Compressors
    • 2 Demethanisers (each lift at 700Tons)
    • Slug Catcher (450Tons)
    • HP Absorber (900Tons each lift)

  Category:
  Comments: Comments Off on Onshore Gas Development Phase III Project – OGD III

Borouge 2 – Polyolefin Project – Pp1, Pp2 & Common

By accadmin,

The objective of the Borouge 2 project was to triple the polyolefins manufacturing capacity of the Ruwais plant. Approximately US$ 5 billion was invested to enable Borouge to produce a total of 2 million tonnes of Borstar® polyolefins per year. The Borouge 2 project includes an additional ethane cracker, a third polyethylene unit, an olefins conversion unit (OCU) for converting ethylene to propylene, and two new polypropylene units, spearheading the company’s entrance into polypropylene production.

Major Scope and Quantities Include:

  • 6,955 T of Steel Structure
  • 405,011 Inch Dia of Piping
  • 575 T of Pipe Supports
  • Static & Machinery Equipment erection
  • Heavy Equipment erection, mainly:
    • 2 No 1st Gas Phase Reactors (304T each)
    • 2nd & 3rd Gas Phase Reactors (190T each)
    • 2 Loop Reactors (395T each)
    • 2 No Dump Tanks (138T each)

  Category:
  Comments: Comments Off on Borouge 2 – Polyolefin Project – Pp1, Pp2 & Common

North East Bab Phase I Development Project

By accadmin,

The North East Bab (NEB) Project is a Grass Root Field Development Project to produce 110,000 barrel per day and  consists of:

  • 1 new Central Processing Plant (CPP) at Al Dabb’iya consisting of 2 Production Trains
  • 1 new Central Processing Plant (CPP) at Rumaitha consisting of 1 Production Train
  • New facilities at various clusters and 146 isolated wells
  • Complete new flow-line and pipeline networks

Major Scope and Quantities Include:

  • 255,000 ID of Piping
  • 2,800 Tons of Static & Rotating Equipment erection
  • 3,000 Tons of Steel Structure
  • 350 Tons of Tanks erection (91 Tanks)
  • Electrical & Instrumentation Works (650 KM of cables and cable trays, 38,000 instruments, JB’s, etc.)

  Category:
  Comments: Comments Off on North East Bab Phase I Development Project

Sajaa Gas Processing Plant

By accadmin,

The plant involves the sweetening of feed gas and the production of sulphur pastilles. The raw gas is separated at a pig receiver and slug catcher and the feed gas is sent to the Amine Treatment Facility where it is measured and analyzed then sent to the Sulphur Recovery Plant, storage, and loading areas.

Major Scope and Quantities Include:

  • 145,000 Inch Dia of Piping
  • 2,400 Tons of Steel Structure
  • 3,500 Tons of Static & Rotating Equipment erection
  • Electrical & Instrumentation Works (400 KM of cables and cable trays, 3,000 instruments etc.)

  Category:
  Comments: Comments Off on Sajaa Gas Processing Plant

ULG – LSGO Project and Heaters

By accadmin,

The facilities at Ruwais Refinery process 140,000 BPSD of crude and 280,000BPSD of Condensate.

The project aimed to modernise existing units and add new units to meet quality requirements for Unleaded Gasoline (ULG) and Low Sulphur Gas Oil (LSGO).

It involved installation of new process units, new utility units, revamping of existing units, and installation of new and revamping associated Electrical, Instrumentation and Control Facilties.

Major Scope and Quantities Include:

  • 425,000 Inch Dia of Piping
  • 1,500 Tons of Steel Structure
  • 1,200 Tons of Pipe Supports
  • 10,000 Tons of Static & Rotating Equipment erection
  • Electrical & Instrumentation Works (650 KM of cables and cable trays, 25,000 instruments etc.)

  Category:
  Comments: Comments Off on ULG – LSGO Project and Heaters