Conversion of Simple Cycle Gas Turbines to Combined Cycle at PP10 CCGT Power Plant

Client: Arabian Bemco Contracting Co.
Owner: Saudi Electric Company
Consultant Engineers: Worley Parsons Resources & Energy
Project Value: USD 25,000,000
Period of Work: 20 months - ending June 2014

Project scope: Mechanical Construction Work of Two Blocks, which includes 8 Dual Pressure Heat Recovery Steam Generators, 2 Air-cooled Condensers and 2 Steam Turbines along with all relevant Piping, Pipe Racks, Painting & Insulation Works.

The Combined Cycle Gas Turbine (CCGT) Power Plant is located on the outskirts of Riyadh City on Al-Kharj road in the Central Province.

The new combined cycle will add 1,300 MW to the existing 3,400 MW plant, by adding 10 STGs, 40 HRSGs and 10 ACCs at Power Plant, including all support facilities for converting the simple cycle power plant to a combined cycle power plant.

Major Scope and Quantities Include:

  • 240,000 ID of Piping
  • 19,000 Tons of Static & Rotating Equipment erection
  • 6,000 Tons of Steel Structure