Mesaieed A 2000mw Ipp Project
Project scope: Mechanical Construction Works of the 6 HRSGs including Stacks & Steel Racks as well as the Piping Works in the Power Block and the Balance of Plant "BOP".
The power plant comprises three configuration groups (2x2x1) and two black start turbines, with a total of six 9FA gas turbines, six 1,500T HRSG recovery boilers, three D11 type condensing steam turbines and two 6B dual gas-diesel turbines.
Major Scope and Quantities Include:
- 6,000 T of Structure & Pipe Racks
- 66,000 lm of CS, Alloy & SS Piping