Sajaa Gas Processing Plant

Client: Petrofac International
Owner: Crescent Petroleum Company International Ltd.
Project Value: USD 10,813,000
Period of Work: 14 months - ending December 2005

Project scope: Piping Fabrication and Installation, Equipment and Structural Steel Erection, Electrical & Instrumentation Installation, Testing & Pre-commissioning activities and Commissioning assistance.

The plant involves the sweetening of feed gas and the production of sulphur pastilles. The raw gas is separated at a pig receiver and slug catcher and the feed gas is sent to the Amine Treatment Facility where it is measured and analyzed then sent to the Sulphur Recovery Plant, storage, and loading areas.

Major Scope and Quantities Include:

  • 145,000 Inch Dia of Piping
  • 2,400 Tons of Steel Structure
  • 3,500 Tons of Static & Rotating Equipment erection
  • Electrical & Instrumentation Works (400 KM of cables and cable trays, 3,000 instruments etc.)